Unloading and acceptance of pumps

28.06.2018

Unloading and acceptance of pumps

Within the framework of Unit 2 design life time extension programme the second set of controlled leakage pump 2NOP-1,2 and 2TVN-1,2 (waste water pump)is already delivered to ANPP and their unloading and acceptance is foreseen for June 29.