The General Director of the «HAEK» CJSC in the «Radiolur» studio

28.10.2019

The General Director of the «HAEK» CJSC in the «Radiolur» studio

«For Armenia it is very important to have nuclear power industry. We hope to extend the lifetime of our nuclear power plant till 2040, and before that we’ll try to build a new NPP. I hope Russia will help us in this matter», - said the Prime Minister of Armenia Nikol Pashinyan in his interview given to «Echo of Moscow» radio station.

Are there any scheduled actions in that regard? A nuclear power unit of what capacity can ensure energy independence of Armenia? Approximately how much the construction of the new nuclear power plant will cost?

In the studio of «Radiolur» Alisa Gevorgyan discussed these issues and the future of Armenian nuclear power industry during the conversation with Movses Vardanyan, General Director of the «HAEK» CJSC.

See the details in the video material:

https://hy.armradio.am/2019/10/23/%d5%ab%d5%9e%d5%b6%d5%b9-%d5%af%d5%a1%d6%80%d5%aa%d5%a5%d5%b6%d5%a1-%d5%b6%d5%b8%d6%80-%d5%a1%d5%bf%d5%b8%d5%b4%d5%a1%d5%af%d5%a1%d5%b5%d5%a1%d5%b6%d5%ab-%d5%af%d5%a1%d5%bc%d5%b8%d6%82%d6%81%d5%b8/?fbclid=IwAR3Lv7uisGI6FMAMxrGLLGhba2VA4uo2qHAey-IoV9cJeVV95xMw-JM62Gk