THE ARMENIAN NUCLEAR POWER PLANT HAS BEEN CONNECTED TO THE UNITED ENERGY SYSTEM

14.07.2025

THE ARMENIAN NUCLEAR POWER PLANT HAS BEEN CONNECTED TO THE UNITED ENERGY SYSTEM

Following the outage-2025, on July 13 of this year, at 03:58 am, the 3rd turbine-generator of the Armenian Nuclear Power Plant was connected to the unified energy system of Armenia, one day earlier than planned.

As of now, the plant is operating in its normal mode, adhering to safety and reliability standards.